Well Completion and Work Over

October 16, 2015

Well Completion and Work Over

Jadwal Pelatihan Well Completion and Work Over

TanggalTempatKota
Belum ada jadwal terbaru

Instructor by : Widradjat Abdekasan 

DESKRIPSI

Well completion is considered to be one of the most critical practices for reservoir exploitation and management. During this process, the responsible personnel is tasked to optimally design and install a system that can deliver its full potential to optimize oil, gas and production without compromising safety and reliability. During the field life cycle, some reservoirs undergo some physical and chemical changes. This leads to loss of revenue as the wells are no longer operating at their optimal conditions. Hence, workover and well intervention practices are required to safely and efficiently restore the wells back to production.

This course focuses on different technological innovations to optimize reservoir drilling and completion practices, to improve well productivity. It provides practical exercises and industrial applications from different operating environment (land, swamp, offshore, including deepwater offshore).
It covers different types of completion design and installations. In addition, in-depth discussions on the emerging techniques would be covered.

OBJECTIVES

  • Identify and understand the parameters that influence the selection and design of completion components.
  • Integrate the importance of completion process to future production.
  • Deliver techniques to select the best tubing size and best materials for well completion.
  • Gain practical methods to design, plan and install safe and efficient well completion and workover.
  • Manage well environments with extreme reservoir conditions (pressure, temperature, etc)
  • Bridge the importance of well design in relation to the ability to carry out well intervention.
  • Explore new technological developments in well completions and workovers.
  • Plan an appropriate intervention and workover strategy to maintain or increase the field production.

OUTLINE

1. Course Introduction

2. Starter quiz

3. Review of starter quiz

4. Introduction to Completion

5. Darcy law and skin

6. Well performance

7. Perforations

8. Introduction to completion design project

9. Reservoir Completion – Well stimulation

10. Introduction to Hydraulic Fracturing

11. Sand Control completion

12. Sand control exercises

13. Enhancing Production through Artificial Lift Methods

  • Gas Lift
  • ESP
  • Jet Pumps
  • Sucker Rod Pumps

14. Tubing Performance

  • Basics of PVT (Pressure, Volume, Temperature)
  • Multi-Phase Flow
  • Tubing Sizing
  • Interface with Reservoir Completion
  • Lazy Wells

15. Production Chemistry: Handling Challenging Reservoir Environments

  • Introduction to Reservoir Fluids
  • Identification of Common Production Problems
  • Reduction Methods to Common Production Problems
    • Scales
    • Wax
    • Asphaltenes
    • Hydrates
    • Reservoir Souring & H2S

16. Tubing Stress Analysis

  • Purpose of Stress Analysis
  • Stress Loads
    • Stress and Strain
    • Axial Loads
    • Burst/Collapse
    • Tri-Axial Analysis
  • Safety Factors and Design Factors
  • Load Cases
  • Completion Equipment and Connections

17. Materials Selection

  • Metals
  • Metallurgy & Corrosion
  • Elastomers and Plastics
  • Protective Coatings

18. Completion Components (Features and Usage)

  • Completion Philosophy
  • Completion Components
    • Christmas Tree, Tubing Hangers, Tubing, Down Hole Safety Valve, Packers, Tail Pipes, Expansion Devices, Nipples, Mandrels, Gauges, Etc.
  • Interface with Reservoir Completion

19. Completion Operation Base Preparation

20. Equipment Purchasing and Factory Acceptance

21. Service Contract

22. Equipment Preparation

23. Technical Program

24. Rig Preparation and Completion Installation Process

25. Operation Planning

26. Equipment Shipping

27. Equipment Reception

28. Pre-Job Meeting

29. Casing Cleaning Operation

30. Running in hole the completion equipment

31. Well Clean-Up

32. Reporting

33. After-Action Review

34. Emerging Techniques

35. Fiber Optics: Distributed Temperature System (DTS), Pressure/ temperature (P/T), etc

36. Interventionless packers (Hydrostatic packers, swelling packers, etc)

37. In-situ self generating weak acid

38. Expandable tubulars

39. Expandable Sand Screens (ESS)

40. Sand Control in High angle and long interval: Alternate path technology (SHUTS, CAPS, etc)

41. Formation Isolation Valves (FIV)

42. Intelligent & Smart Well Completion: Interval Control Valves (ICV)

43. Underbalanced Drilling and Completion

44. Cased Hole Circulation Drilling and completion

45. Multistage Fracturing

46. Well Control

  • Well control Equipment
    • Blowout Preventer System Requirements
    • Choke Manifold
    • Circulating System
  • Kicks and its causes
  • Well Killing Operation
    • Forward circulation
    • Reverse circulation
    • Bullheading
    • Lubricate and Bleed

47. Workover Operations

  • Workover definition and description
  • Workover Types:
    • Safety Workover (SWO)
    • Long term suspension (LTS)
    • Plug and Abandonment (P&A)
    • Production enhancement (PE)

TRAINING METHOD

Presentation

Discussion

Case Study

Evaluation

FACILITIES 

Training Kit

Handout

Certificate

Lunch + 2X Coffe Breaks

Souvenir

Pick Up Participant

Form Pre-Registrasi

Data Materi Training

Topik Training : Well Completion and Work Over
Link
*Jumlah Peserta Estimasi Jumlah Peserta yang di ajukan
*Nama Peserta Yang Didaftarkan

Personal Data

*Nama
*Jabatan Jabatan/Divisi/Departement
*Nama Perusahaan
*Alamat Perusahaan
*Email Perusahaan
*Email Alternatif eg: gmail, yahoo, hotmail
*Telepon Kantor
Ekstensi
*Handphone
* Harus di isi
error: Content is protected !!