PT Fresh Galang Mandiri

Profesional - Komitmen - Kualitas

Production Optimization of Oil and Gas

November 9, 2013

Production Optimization of Oil and Gas

Jadwal Pelatihan Production Optimization of Oil and Gas

TanggalTempatKota
Belum ada jadwal terbaru
Instructor by : I Nengah Diasta

25 – 28 November 2013, Melia Purosani Hotel Yogyakarta

OBJECTIVES

  • Make basic PVT properties and inflow performance calculations related to artificial lift
  • Understand and apply multiphase tubing and pipe flow principles
  • Select the appropriate artificial lift system
  • Compare systems to determine what system is most economically feasible
  • Specify components and auxiliary equipment needed for each system
  • Know what best practices are available to extend the life of equipment and installed lift systems
  • Apply basic design and analysis concepts
  • Design system features that allow for gassy production, production with solids, viscous production, and for other harsh environments.

COURSE CONTENTS

  1. Introduction
  2. Artificial Lift Systems
  3. Overview – Nodal Analysis
  4. Oil Well Flow Prediction
  5. Gas Well Loading Prediction
  6. Selection of Artificial Lift Methods
  7. Gaslift
  8. Electric Submersible Pumps
  9. Jet Pumps

PARTICIPANTS

Engineers, technicians, field supervisors, and others who select, design, install, evaluate, or operate artificial lift systems.

TRAINING METHOD

Presentation, Discussion, Case Study, Evaluation

FACILITIES

 

Training Kit

Handout

Certificate

1 x Lunch

2 X Coffee Break

Souvenir

 

Form Pre-Registrasi

Data Materi Training

Topik Training : Production Optimization of Oil and Gas
Link
*Jumlah Peserta Estimasi Jumlah Peserta yang di ajukan
*Nama Peserta Yang Didaftarkan

Personal Data

*Nama
*Jabatan Jabatan/Divisi/Departement
*Nama Perusahaan
*Alamat Perusahaan
*Email Perusahaan
*Email Alternatif eg: gmail, yahoo, hotmail
*Telepon Kantor
Ekstensi
*Handphone
* Harus di isi
TAGS , ,
error: Content is protected !!